Pleasant Hill construction update: Upcoming construction activities include powering on the new traffic control signals at Conrta Costa Blvd Taylor Blvd and Contra Costa Blvd and Alan Dr. This will include the installation of new traffic cameras, controller cabinets, and other traffic control devices. The signal turn-on is scheduled for May 6, 2025. In order to complete the work, traffic will be restricted in the work zone to one lane in each direction. Motorists are advised to drive slowly thru the work zone and to follow all traffic control devices.
I am not sure who is responsible or approved this so called improvement. Taking away dedicated right turn lanes, making lanes narrow etc; adding a traffic light a very short distance from this intersection is already wrecking havoc on traffic flow. The benefits of having traffic run smoothly far out weigh these changes
Another waste of taxpayer $$ … why “fix” something that isn’t broken? …. did a city staffer’s brother in law get the contract?
Yay! Sounds exciting may go to pleasant hill to watch.
the city of concord needs to work on the lights on concord boulevard at concord high school those lights take forever to change.
Well now, in foreground of picture is a patch of dirt then a yellow rectangle,
then ? ? ? ? ? What is purpose of that raised concrete curbing, one end
squared off and other end rounded with yellow rectangles either side ?
A designed in tripping hazard ? ? ? Definitely a hazard for bike riders.
Anyone know why that hole exists ? ? ?
.
Design rates right up there with “bike lanes” on Lennon Way in Walnut Creek.
Bike lane starts at curb, then vehicle parking, then traffic lane.
.
Slight problem aside from massive amounts of green paint, anyone exiting
their vehicle stand a very good chance of being struck by passing traffic
or having their drivers door sheared off.
Area around Kaiser Shadelands medical offices.
Lawsuits waitin’ to happen.